The company is working on quality control laying of foundations in accordance with design data process requirements and relevant standards
- Piles CFA method
- Piles dry or with the use of mud ( Basketdrill method )
- Retaining walls and diaphragms, advanced mud filling method
Anchor bolts
Prestressed anchor cable
Report at the end of production includes the geometry of the piles, the geological by pile cut, foundation working part load calculation , the laboratory testing of concrete and mud as well as plan AS Made sheduling. |